Compliance Standards

Standards Met.
Documentation
Supplied.

Every service we install is delivered to the relevant Australian Standard or

National Construction Code requirement. Documentation is produced as part

of the scope — not requested after the fact.

Every service we install is delivered to the relevant Australian Standard or National Construction Code requirement. Documentation is produced as part

of the scope — not requested after the fact.

AS 2890

Parking Facilities

Bay layouts, space dimensions, aisle widths, accessible bay placement counts, wheel stops, speed humps, bollards, and signage. Every elements installed to AS 2890 dimensions. Compliance confirmed in writing at completion

AS 1428

Access and Mobility

TGSI placement at accessible pathway hazard points, accessible bay dimensions and approach paths, and surface texture documentation Referenced under AS 1428.1 and AS 1428.4.1 Confirmed on the ITP

NCC

National Construction Code

Stair nosing specification, luminance contrast, and slip resistance to requirements. Compliant nosing's supplied and installed , installation on the ITP at practical completion

Applicable Standards

The Standards That Govern Car Park Completion Scope.

These are the Australian Standards and codes that govern the work we install. Every

service is delivered to specification. Documentation is produced as part of the scope.

AS 2890

Parking Facilities

Bay layouts, space dimensions, aisle widths accessible bay placement, while stops, speed humps, bollards, and signage. The primary standard governing industrial car park design and installation. BSP delivers every elements to AS 2890 dimensions, documented and sinned of on the ITP

BSP Compliance Deliverables

Bay layout to AS 2890.1 minimum dimensions — confirmed on ITP before handover.

Accessible bay count, dimensions and placement to AS 2890.6.

Line marking dimensions, arrow placement, bay numbering and kerb clearances verified.

Wheel stop placement and type confirmed to AS 2890.1.

Signage to AS 2890.1 and AS 2890.6 — accessible parking signage confirmed.

AS 1428

Access and Mobility

Accessible bay dimensions, TGSI placement at hazard points, and accessible pathway confirmation. Compliance documented and signed off. referenced under AS 1428.1 and AS 1428.4.1

BSP Compliance Deliverables

TGSI type, placement and fixing method confirmed to AS 1428.4.1 at each hazard point.

Accessible bay dimensions and approach path compliance confirmed in writing.

Surface texture documentation for tactile accessible areas submitted with ITP

NCC

National Construction Code

Stair nosing specification, luminance contrast, slip resistance rating, and installation sign-off. Compliant nosing's supplied and installed to NCC requirements. Signed off on the ITP

BSP Compliance Deliverables

Stair nosing material specification confirmed to NCC requirements before installation.

Installation method documented — fixing type, substrate preparation and adhesion.

NCC-compliant stair nosing sign-off included on ITP at practical completion.

QBCC-Builder's Licence

#15551275

Licensed Builder(Mid Rise). Licensed Manager

QBCC Licensed Builder and Project Manager

BSP Australia holds a Queensland Building and Construction Commission Builder's Licence — Licensed Builder (Mid Rise) and Licensed Project Manager. Our licence is publicly verifiable on the QBCC register. A licence is not a decoration. It means we are accountable for the work we sign off on.

WHAT WE PRODUCE ON EVERY JOB

The BSP Delivery Stack

Lead-in: Five stages. Full documentation set. Every job.

Document

When

Description

Scope Lock

Scope Confirmed.

SWMS Submitted.

Plans and specifications reviewed. Scope confirmed in writing. Site-specific SWMS submitted before mobilisation commences

Site Clearance

Site Inspected. Conditions Documented.

Per-mobilisation site inspection completed o n person. Concrete cure, access constraints, and sequencing confirmed and recorded before works commence

Programme Sync

Programme Aligned.

ITP Opened

Works programme aligned to construction milestone. ITP opened. Hole points and Witness points confirmed with your site team

Blueprint Delivery

Works Installed.

ITP Completed

All five services installed to approved drawings and specifications. Hold points observed. ITP completed and signed off as works progress

HandoverCert

Form 12 issued.

PC Achieved

ITP signed and submitted. As 2890, AS 1428, and NCC compliance confirmed in writing. Defect-free handover declaration issued. Form 12 practical completion. Scope closed.

Safety & QA Platforms

Your Systems. Our Documentation.

We work in the safety and quality assurance platforms your project requires.

Platform onboarding, inductions and compliance submissions are completed

within your system — not managed outside it.

HammerTech

Breadcrumb

Aconex

Procore

NEXT sTEP

Upload Plans and Specifications

Upload your plans. We review your scope and respond within 48 hours.

NEXT sTEP

Upload Plans and Specifications

Upload your plans. We review your scope and respond within 48 hours.

Building Safety Products Australia. Complete industrial car park and safety subcontract for industrial builders across South East Queensland.

QBCC Builder's Licence #15551275

Contact

2/14 Hopper Ave
Ormeau QLD 4208

© 2026 BSP Australia. All rights reserved.

AS 2890 · AS 1428 · NCC