Capability Statement

One Subcontract.

Complete Industrial Car Park Scope.

Line marking, car park fixtures, bollards, guardrails, and safety barriers.

Five services. One trade package. One Form 12. One point of responsibility.

5

services. One subcontract.

QBCC

#15551275

Licensed Builder (Mid Rise) •

Licensed Project Manager.

One Form 12 at handover

20+

Years deliverin industrial car ark scope.

Recent Work

Installed and Signed Off.

Pimpama

South East Queensland

Ormeau — Zupp

South East Queensland

Industrial Site

South East Queensland

Trade Scope

The Complete industrial car park trade package

The BSP trade package covers every element of industrial car park completion — including line marking, bollards, car park fixtures, guardrails, and safety barriers.

One subcontract. Full scope. If it goes into an industrial car park, we supply it, install it, and certify it.

01

Line Marking

Bay layouts, directional flow, accessible bays, and shared zones — marked to AS 2890 dimensions. Coordinated with your concrete pour and curing schedule.

AS 2890

02

Car Park Fixtures

Everything between the lines — wheel stops, speed humps, signage, TGSIs, and stair nosings. Supplied and installed to AS 2890, AS 1428, and NCC. Nothing left for another trade.

AS 2890 AS 1428 NCC

03

Industrial Bollards

Complete range of surface-mounted and inground units — 155, 165, and 220mm diameter, industrial grade. Supplied and installed according to civil and structural details.

Traffic Management

04

Guardrail

Heavy vehicle impact protection for warehouses, logistics facilities, and multi-storey car parks. Supplied and installed to engineered drawings. Single-rail, double-rail, and pedestrian handrail options available.

Impact Protection

05

The BSP Delivery Stack

Our project delivery method: works sequenced according to your programme. ITP and QA systems in place. One Form 12 provided at handover. Every job. Every time.

06

Safety Barriers and Handrail

Pedestrian segregation and walkway protection for industrial sheds, warehouses, and car parks, supplied and installed to specification.

Safety Infrastructure

documentation and compliance

SWMS. inductions. QA. Sign Off

SWMS

Safe Work Method Statement

Site-specific SWMS submitted prior to mobilisation. Every job, every time.

ITP

Inspection and Test Plan

Hold points, witness points, and sign-off columns completed during the works

AS 2880

Compliance Documentation

Bay layouts, dimensions, accessible bay counts, and signage compliance confirmed in writing.

AS 1428

Accessibility Compliance

TGSI placement, accessibility bay dimensions, and surface texture documentation.

NCC

NCC Compliance

Stair nosing specification and installation sign-off on the ITP.

PC

Practical Completion Handover

Completed scope checklist. Handover declaration issued. Form 12 issued. Practical completion achieved.

THE BSP PROCESS

The BSP Delivery Stack

Five stages. Every job. Every time.

01

ScopeLock

Scope Confirmed. Programme Locked.

Plans and specifications reviewed. Scope confirmed in writing. Programme milestone dates agreed before mobilisation commences. SWWS submitted.

02

Site Clearance

On Side Before We Start.

We visit the site before mobilisation. Concrete curing, access constraints, and trade sequencing are assessed and confirmed in person. We know the site before we’re on it.

03

Programme Sync

We Read Your Programme. We Plan Accordingly.

We work from your programme—not from a phone call. Delivery windows are confirmed, and our sequence is locked in. No surprises on access, timing, or coordination.”

04

Blueprint Delivery

Scope Delivered to Specification.

All five services installed to approved drawings and specifications. Hold points observed. ITP completed as works progress. You don’t manage us—we manage ourselves.

05

Handover Cert

Documented. Signed off Handed Over Clean

ITP signed and submitted. Scope completion report delivered. Defect-free handover declaration issued. Form 12 provided at practical completion and scope closed.

Systems & Platforms

Your Systems. Our Documentation.

Your Systems. Our Docurnentation_ We're platforrn fluent.

HammerTech

Breadcrumb

Aconex

Procore

Award the Subcontract

Ready to Award the Car Park Scope?

Upload your plans and specifications. We will review the full scope — line

marking, car park fixtures, bollards, guardrail, and safety barriers — confirm

coverage, and return a subcontract price within 48 hours.

Award the Subcontract

Ready to Award the Car Park Scope?

Upload your plans and specifications. We will review the full scope — line marking, car park fixtures, bollards, guardrail, and safety barriers — confirm coverage, and return a subcontract price within 48 hours.

Building Safety Products Australia. Complete industrial car park and safety subcontract for industrial builders across South East Queensland.

QBCC Builder's Licence #15551275

Contact

2/14 Hopper Ave
Ormeau QLD 4208

© 2026 BSP Australia. All rights reserved.

AS 2890 · AS 1428 · NCC